35 lines
1.5 KiB
Markdown
35 lines
1.5 KiB
Markdown
Title: Foreman Task Brief (Project-specific)
|
||
|
||
Purpose (free text)
|
||
- Complete PROJECT.md Item 12 (Nightlight) - the FINAL infrastructure component (COMPLETE)
|
||
- Achieve 12/12 PROJECT.md deliverables (NOW 12/12)
|
||
- Prepare for production deployment using T032 bare-metal provisioning
|
||
|
||
Current objectives (ranked, short)
|
||
- 1) T033 Nightlight completion: S4 PromQL Engine (P0), S5 Storage, S6 Integration
|
||
- 2) Production deployment prep: NixOS modules + Nightlight observability stack
|
||
- 3) Deferred features: T029.S5 practical app demo, FlareDB SQL layer (post-MVP)
|
||
|
||
Standing work (edit freely)
|
||
- Task status monitoring: Check docs/por/T*/task.yaml for stale/blocked tasks
|
||
- Risk radar: Monitor POR.md Risk Radar for new/escalating risks
|
||
- Progress tracking: Verify step completion matches claimed LOC/test counts
|
||
- Stale task alerts: Flag tasks with no progress >48h
|
||
- Evidence validation: Spot-check evidence trail (cargo check, test counts)
|
||
|
||
Useful references
|
||
- PROJECT.md
|
||
- docs/por/POR.md
|
||
- docs/por/T*/task.yaml (active tasks)
|
||
- docs/evidence/** and .cccc/work/**
|
||
|
||
How to act each run
|
||
- Do one useful, non-interactive step within the time box (≤ 30m).
|
||
- Save temporary outputs to .cccc/work/foreman/<YYYYMMDD-HHMMSS>/.
|
||
- Write one message to .cccc/mailbox/foreman/to_peer.md with header To: Both|PeerA|PeerB and wrap body in <TO_PEER>..</TO_PEER>.
|
||
|
||
Escalation
|
||
- If a decision is needed, write a 6–10 line RFD and ask the peer.
|
||
|
||
Safety
|
||
- Do not modify orchestrator code/policies; provide checkable artifacts.
|