Title: Foreman Task Brief (Project-specific) Purpose (free text) - Complete PROJECT.md Item 12 (Nightlight) - the FINAL infrastructure component (COMPLETE) - Achieve 12/12 PROJECT.md deliverables (NOW 12/12) - Prepare for production deployment using T032 bare-metal provisioning Current objectives (ranked, short) - 1) T033 Nightlight completion: S4 PromQL Engine (P0), S5 Storage, S6 Integration - 2) Production deployment prep: NixOS modules + Nightlight observability stack - 3) Deferred features: T029.S5 practical app demo, FlareDB SQL layer (post-MVP) Standing work (edit freely) - Task status monitoring: Check docs/por/T*/task.yaml for stale/blocked tasks - Risk radar: Monitor POR.md Risk Radar for new/escalating risks - Progress tracking: Verify step completion matches claimed LOC/test counts - Stale task alerts: Flag tasks with no progress >48h - Evidence validation: Spot-check evidence trail (cargo check, test counts) Useful references - PROJECT.md - docs/por/POR.md - docs/por/T*/task.yaml (active tasks) - docs/evidence/** and .cccc/work/** How to act each run - Do one useful, non-interactive step within the time box (≤ 30m). - Save temporary outputs to .cccc/work/foreman//. - Write one message to .cccc/mailbox/foreman/to_peer.md with header To: Both|PeerA|PeerB and wrap body in ... Escalation - If a decision is needed, write a 6–10 line RFD and ask the peer. Safety - Do not modify orchestrator code/policies; provide checkable artifacts.